Solar park in Bosnia with 560 MWp - for sale
EUR 160,000
Ακίνητο για
Πώληση
Χώρα
Bosnia and Herzegovina
Δημοσιεύθηκε
22/10/2024
Περιγραφή
Project overview
A large-scale solar park in Bosnia with an impressive capacity of 560 MWp is for sale. The solar park consists of several sub-areas that are located in close proximity to each other:
60 MWp (Ready-to-Build - RTB)
200 MWp (shortly before RTB)
6 x 50 MWp (shortly before RTB)
The 60 MWp area is already RTB (Ready-to-Build), while the other areas will reach this status shortly. This project offers investors an excellent opportunity to buy into a strategically planned solar park with high yield potential.
Technical highlights
Capacity: 560 MWp divided into several sub-areas
Electricity yield: approx. 1,480 MWh/MWp, which represents an above-average yield for the location
Grid connection: The solar park has excellent grid connections with a 110 kV and a 400 kV line, which are located next to or partly on the plots
This technical infrastructure ensures that the electricity generated is reliably fed into the grid and supports the efficiency and profitability of the project.
Price structure
Ready-to-Build (RTB) price: €160,000 / MWp, including 50-year lease of the land
COD (Commercial Operation Date) price: €800,000 / MWp for the commissioning and ready-to-build areas
A large-scale solar park in Bosnia with an impressive capacity of 560 MWp is for sale. The solar park consists of several sub-areas that are located in close proximity to each other:
60 MWp (Ready-to-Build - RTB)
200 MWp (shortly before RTB)
6 x 50 MWp (shortly before RTB)
The 60 MWp area is already RTB (Ready-to-Build), while the other areas will reach this status shortly. This project offers investors an excellent opportunity to buy into a strategically planned solar park with high yield potential.
Technical highlights
Capacity: 560 MWp divided into several sub-areas
Electricity yield: approx. 1,480 MWh/MWp, which represents an above-average yield for the location
Grid connection: The solar park has excellent grid connections with a 110 kV and a 400 kV line, which are located next to or partly on the plots
This technical infrastructure ensures that the electricity generated is reliably fed into the grid and supports the efficiency and profitability of the project.
Price structure
Ready-to-Build (RTB) price: €160,000 / MWp, including 50-year lease of the land
COD (Commercial Operation Date) price: €800,000 / MWp for the commissioning and ready-to-build areas
IMLIX ID
PMn-Bn-1
- 96 Προβολές